Allianz Arena
The project in this case concerned the possibly worldwide largest membrane roof and facade cover of a new built stadium, and was executed as a cantilever structure of framework joints. For the main structure were used around 5.500 tons of steel. The secondary structure is the construction that fixes the outer shell ETFE transparent air cushions, resistant to rough weather conditions and illuminated in the traditional colors of whichever of the two Munich teams. It consists of 2.800 tons of steel rectangular pipes that make up a total of 2.784 different diamond shapes to accommodate the PTFE pads. Team members of vision4venue were involved in the design and build process, and at the execution of construction of the roof and façade.
Interactive view from the inside
Detailed project data
Type of project | Roof |
Project Period | May 2003 – Mar 2005 |
Client | FC Bayern München |
Construction Costs | € 25 Mio |
Sport use | Football |
Capacity | 71.000 |
Business seats | 2.000 |
VIP boxes | 106 |
Team members | Gerhard Hupfer |
More info about this project?
Please contact us